Category Archives: Hotel mechanical installation

Hotel Mechanical İnstallation

Hotel Mechanical İnstallation

Hotel Mechanical İnstallation
Hotel Mechanical İnstallation

The waterproofing details, drainage systems and the materials to be used in the building sections are indicated in their architectural and installation projects by specifying the relevant standards. Waterproofing details associated with carrier elements such as underfloor, shoring surfaces and dilatation are also indicated in the static project.

Hotel mechanical plumbing insulation design;

a) Hotel Construction elements are subjected to pressure or pressure-free water effects and mechanical installation with thermal water density, mechanical installation, the removal of water from the structure, orientation and evacuation systems are organized.

b) In the building where the waterproofing will be applied, the ground shifts due to the ground characteristics, the basic shifts and rotations, the building blocks or the existing old buildings and the joint gaps to be left between the new buildings will be considered.

c) Waterproofing in new buildings is made according to the principle of application of the structural elements from the side exposed to water.

(3) Hotel Mechanical installations shall include the waterproofing materials specified in the project details; it must meet the minimum performance characteristics defined in the relevant national implementing rules standards, technical specifications and this Regulation. The thickness and / or consumption information for which these performance characteristics are provided must be shown in the project details.

(4) In determining the types of mechanical waterproofing materials; Mechanical tesiast construction companies, application standards and mechanical installation manufacturer’s instructions are also taken into account. In mechanical installation project applications, the use of materials that do not adversely affect each other’s performance characteristics is essential.

(5) For the mechanical and waterproofing materials of the Hotel, the standards shall be complied with. For the applications of mechanical waterproofing, new technical specifications to be published for the uses given in this regulation shall be evaluated within the scope of mechanical installation contractors contracts.

Thermal insulation mechanical installation

Thermal insulation mechanical installation

Thermal insulation mechanical installation
Thermal insulation mechanical installation

Thermal insulation project cover must be in accordance with the standards.
– The plan of the building to be prepared should be prepared in A4 size and included in the project. In the plan, the floor height, direction, location (contiguous arrangement, wind receiving condition etc.) of the building should be stated.
– The building materials constituting the structural elements must be compatible with the architectural project in terms of their type, thickness and thermal values.
– Identity certificate of heat requirement of the structure should be arranged. The document in the building province, purpose of use, type of fuel, energy efficiency status should be specified. Approximate annual fuel consumption should be calculated.
– The type of ventilation of the building, internal temperature values, gross volume, usage area etc. architectural values should be specified.
– Monthly heating energy requirement table should be prepared.
– The annual heating energy requirement should be calculated in kW / m² and lower than the limit values (not equal).
– The building specific heat loss calculation should be made and the thermal conductivity values obtained should be equal to or smaller than the values given in the standard.
– The transparent surfaces (windows) in the building shall be specified according to each direction (m²).
– If the ventilation type is selected and the mechanical ventilation system is to be installed, calculations must be made.
– Air exchange rate in natural ventilated buildings nh: 0,8 It should be taken.
– In adjacent buildings, the walls facing the adjacent space are considered as the external wall and are calculated according to the external environment conditions.
– All reinforced concrete elements in the building must be insulated.
– The thermal insulation materials used must have the available properties and thickness.
– Condensation and evaporation calculation of the building’s heat loss surfaces should be done.
– The month in which the condensation first appears is considered as the beginning month.
Condensation evaporation calculations are made and the graphs are drawn for the next month and the following month.
– It should not exceed 1 kg / m² in the externally insulated structural elements of the condensing water body and should not exceed 0.5 kg / m² in the insulated reinforced concrete structural components.
– The mass of the wooden material should not exceed 5% of its mass due to the mass of condensate.
– The mass of the hardboard material should not exceed 3% of its mass due to the mass of condensation water.
– The body of vaporized water should not be less than the condensed water body.
– Construction details of the building elements are drawn and U values must be specified.